| 4D v13.4Day of | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|  | 
    4D v13.4
 Day of 
         | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Day of ( date ) -> Function result | ||||||||
| Parameter | Type | Description | ||||||
| date | Date |   | Date for which to return the day | |||||
| Function result | Longint |   | Day of the month of date | |||||
The Day of command returns the day of the month of aDate.
Note: Day of returns a value between 1 and 31. To get the day of the week for a date, use the command Day number.
The following example illustrates the use of Day of. The results are assigned to the variable vResult. The comments describe what is put in vResult:
 vResult:=Day of(!12/25/92!) ` vResult gets 25
 vResult:=Day of(Current date) ` vResult gets day of current dateSee the example for the command Current date.
	Product:  4D
	Theme:  Date and Time
	Number:  
        23
        
        
        
	
	Created:  < 4D v6